Large Power Transmission – Coal Bed Methane

Large Power Transmission – Coal Bed Methane

This rate component is applied to coal bed methane customers requiring 1,000 kVa of capacity who take delivery at PRECorp’s transmission voltage (69 kV) and metered at one point of delivery. This rate is not applied to compression loads with individual motors of 1,000 or greater of horsepower.

The basic charge is $1,000 per month with a demand charge of $1.50 per kilowatt. The demand charge is $16.99 per kilowatt and the energy charge is $0.027720 per kilowatt hour per month.

A billing demand is derived and power factor adjustment is applied.

Documentation