Load Evaluation

Load Evaluation

Powder River Energy requests completion of this form if you wish to add an energy load to your operation. PRECorp will evaluate this load request and respond within 30-45 days regarding PRECorp’s ability to serve this load. Any system modification required to serve this load will be discussed. This analysis will be considered valid for a period of 90 days following PRECorp’s response, after which time this load would need to be re-evaluated.

Download fillable form